• Peak Drive Pilot Project

    Peak Drive Pilot Project

    Benefits

    This project is one of the largest vehicle-to-grid demonstration projects globally, with 21 bi-directional chargers and Nissan LEAF vehicles in 3 commercial office buildings in downtown Toronto. This showcase system uses an electric vehicle and energy storage system to reduce the customers’ demand charges.

    See More
  • 150 Bloor Street West Building Optimization Project

    150 Bloor Street West Building Optimization Project

    Professional Services

    Powered by our Peak Synergy software, our Building Intelligence Platform (BIP) uses real-time data captured by sensors that feed into the predictive analytics to generate instantaneous alerts, allowing building operators to continually optimize their building.

    Energy Cost Savings

    $ 439,219

    Emissions Reduced

    367.85 tCO2e

    See More
  • 95 St. Clair West Building Optimization Project

    95 St. Clair West Building Optimization Project

    Professional Services

    95 St Clair Avenue West is a 16-storey commercial office building serviced by Colliers International with tenant such as Canadian cooperative The Desjardins Group – the largest federation of credit unions in North America.

    Energy Cost Savings

    $ 177,041

    Emissions Reduced

    148.27 tCO2e

    See More
  • Westchester Multiple Battery Storage Project

    Westchester Multiple Battery Storage Project

    Peak Synergy

    For a Westchester customer, Peak Power delivers ICAP and delivery charge savings with behind-the-meter storage and Peak Synergy

    Energy Cost Savings

    $ 495,742

    Emissions Reduced

    4,356 tCO2e

    See More
  • Kearny Mesa Battery Storage Project

    Kearny Mesa Battery Storage Project

    Peak Synergy

    This is believed to be the first project of its kind to operate under FERC Order 841 and the CPUC’s Decision on Multi-Use Applications.

    Energy Cost Savings

    $ 394,105

    Emissions Reduced

    6,048 tCO2e

    See More
  • Bruce Power Energy Storage Project

    Bruce Power Energy Storage Project

    Peak Synergy

    Saturn’s Bruce Power Energy Storage Project is located at Bruce Power’s nuclear generation facility. Peak Power operates and optimizes the energy storage system to reduce grid dependency during peak periods and, as a result, reduce electricity costs. The Saturn battery operates for global adjustment, demand response, and price arbitrage.

    Energy Cost Savings

    $ 297,810

    Emissions Reduced

    6 tCO2e

    See More
  • Bloor Islington Place Battery Storage Project

    Bloor Islington Place Battery Storage Project

    Peak Synergy

    For this energy storage project, Peak Power provides peak prediction and asset dispatch services. We also optimize the battery for demand response events.

    Energy Cost Savings

    $ 440,826

    Emissions Reduced

    8 tCO2e

    See More